First up this week, all Drew's hard work! The floors! hooray! They are beautiful and he worked so hard to get them in. In these photos they are dirty, but once they are all cleaned up they'll look stunning against the white! I can't wait.
Then, more of Drew's non-stop handiwork. The house is for the most part ready for final finishes, except that Drew has to put in all the doors, trim, and tile between now and April 22nd. Its A LOT of work, and we're very fortunate that Drew's brother Chris and his mom are here to help out.
Then were the doors and trim. The doors were a surprise to us- we thought the builder was hanging them, so that was a bit frustrating. But, with Chris there to help the guys got them all up in a few days time.
Here's the door to the boys room.
Main floor bedroom.
And then it was on to showers. Drew is doing all the tile. He's been working really hard on getting the tile board and shelves ready for the tile. Here is the main floor bathroom ready to go.
And here's some of the tile!
On to the basement. We haven't shared an update down here for a bit- lots has happened up to the primer.
Stairs heading to the basement.Main hallway in the basement.
Play room (don't worry the freezer will move eventually).
And just like magic, wer'e back upstairs again. This is the master shower, ready for tile.
And finally the main hallway on the second floor. We're getting closer bit by bit.
Drew has to have all tile and trim done by the 22nd, so the painters can come (which I assume means I need to have all paint colors picked by then! Yikes!).
Onward we go!